Sunday 21 May 2017

New kitchen floor

Well, we needed an off-cut for the bathroom, so we got a new galley floor. This one took no time at all compared to the bathroom. If we don't include the time it took to lift the old floor, drive to the studio, lay the old floor on the new one as a pattern, cut it out, and drive back home. Elizabeth did the cut and fit, Pete suggested the we also refloor the plinth under the cooker. Yes!