Sunday, 4 April 2010
From Bronny to Buckby March 26th
We set out on the 26th of March to a cloudy but dry day with patches of sunshine. 2 pics are of Elizabeth, then Pete at Braunston middle lock.
Travelling toward the tunnel from the locks, we passed Braunston's major engineering works. The original line of the canal is being restored, drains are being installed in the towpath and the whole slope near the tunnel entrance is being reformed. We reported the landslide at this point last year, but are sure that we weren't the only ones to inform BW! The many pics are for those of you who enjoy watching how all this canal stuff is done...
Finally, there is a pic of Pete on Bella whilst moored up at Buckby Top Lock. And sorry the pics are all over the place! Blogspot is not the most sophisticated of web programmes.